Roxhill, Rugby

By Brad Davies

June 15th 2016

We go to great lengths to get signs up for our clients. Situated on junction 1 on the M6 motorway, this project for Roxhill required a 200 tonne crane, 70 tonne additional ballast, spider access machine and 32 metres of concrete. The structurally designed steel work took a total of five days to both build and install. Using 3mm Dibond and a spirt flex banner for the faces, the finish strong, durable and smart.